Track Record

NUDEAL’s key personnel have extensive working experience. Some of the completed projects that NUDEAL had actively involved or participated are as follows:

COMPLETED PROJECTS:

NO DETAILS OF CONTRACT CLIENT VALUE OF CONTRACT (RM) CONTRACT PERIOD SUB-CONTRACTOR
1 Proposed Design And Construction Of New Railway Bridge No.123 Pondok Tanjung Taiping KTM Bhd 4,392,860.00 05/00 To 09/00 Emrail Sdn Bhd (Project Management)
2 To Drill Holes On Concrete Sleepers And Fix Dowels For Guard Rails – Bdge No. 123, Pondok Tanjong KTM Bhd 26,800.00 08/00 To 08/00 Emrail Sdn Bhd
3 To Install Expansion Joint, Guard Rail, Water Proofing Membrane, Roadworks, Kerbs And Drainage For Flyover At Jalan Perkasa Link At Taman Shamelin Perkasa Shamelin Holdings Sdn Bhd 248,344.52 09/00 To 12/00 Shamelin Holdings Sdn Bhd
4 Supply Of Precast Concrete Barriers And Hoarding Clips To Bayan Lepas, Penang Seri Meraga Construction Sdn Bhd 269,500.00 06/01 To 11/01 Pakatan Trafik Sdn Bhd
5 Project Jalan Lingkaran Tengah 2 – Pakej Bumihiway (The Missing Link) JKR/ Bumi Hiway (M) Sdn Bhd 6,642,148.78 15/10/00 To 31/03/02 Zabima Enterprise Sdn Bhd
6 Supply Of Precast Concrete Barrier And Hoarding Clips Melaka JKR/Hcm Engineering Sdn Bhd 174,000.00 01/12/01 To 28/02/02 Pakatan Trafik Sdn Bhd
7 Supply Of Pre-Cast Concrete Barrier At Jln Sultan Azlan Shah/Jalan Gopeng Junction JKR/Maraputra 100,000.00 15/06/02 To 15/09/2002 Pakatan Trafik Sdn Bhd
8 Construction Of Half Njb And Retaining Wall – The Middle Ring Road 2 Kuala Lumpur Package Ii (The Missing Link) JKR/ Bumi Hiway (M) Sdn Bhd 97,240.00 5/11/02 To 05/12/2002 Bumi Hiway (M) Sdn Bhd
9 Construction Of Pilecaps For Audi Showroom & Service Centre EON Properties S/B 54,600.00 10/01/03 To 06/03/2003 Pembinaan Shinrai S/B
10 Construction Of A 3 Span Bridge Over Sg. Rasa And Sg. Air-Hitam At Lot P. T. 14039 (Lot 12286), Mukim Tanjung Duabelas, Daerah Kuala Langat Selangor D. E. Bandar Tanming Sdn Bhd 1,342,235.65 1,342,235.65
23/09/02 To 22/03/2003
Bandar Tanming Sdn Bhd (Developer)
11 Execution And Completion Of Rectification Works At Section 4,Bandar Utama Batang Kali,H ulu Selangor, Selangor. Ligamas Sdn Bhd 144,995.00 01/12/03 To 15/01/04 Motibina Sdn Bhd / Innobestari Sdn Bhd.
12 Supply Labour, Materials, Plant And Machinery And Construction Of Pilecap, Pier And Crosshead At Jalan Tun Razak And Kampung Pandan Roundabout. Konsortium Lapangan Terjaya Sdn Bhd 4,391,903.00 23/02/04 To 31/01/2005 [Suspended On 31/05/04 Due To Land Acquisition] Leighton Contractors (Malaysia) Sdn Bhd
13 Supply And Fix Pre-Cast Parapet And Construction Of New Jersey Barrier At Bayan Lepas, Penang. JKR 2,032,598.83 15/06/02 to 15/10/2004 Seri Meraga Construction Sdn Bhd
14 Supply labour, materials, plant and machinery and construct column Tie Beam, Deck Beam, Deck Slab and Parapet Wall for project titled “Chin Swee Bypass III [Bridge Decking]. Genting Resort World Bhd 1,066,990.35 15/02/05 to 30/06/2005 Geohan Sdn Bhd
15 Supply and Deliver concrete barrier for project titled “Proposed Modification for Non-Stop Thorough Traffic Between Ipoh [S] and Jelapang [Package 5: PO No. 5597]. Propel Berhad 1,512,000.00 10/02/06 to 30/06/2006 Soil Centralab Sdn Bhd
16 Supply and Deliver concrete barrrier for project titled “Proposed Modification for Non-Stop Thorough Traffic Between Ipoh [S] and Jelapang [Package 5: PO No. 5690]. Propel Berhad 1,837,500.00 10/02/06 to 31/08/2006 Soil Centralab Sdn Bhd
17 Supply and Deliver connecting pins of Y20 diameter of high tensile reinforcement 300mm long once bended painting with anti-rust Propel Berhad 128,700.00 27/06/06 to 30/09/2006 Soil Centralab Sdn Bhd
18 Supply and deliver traffic management, labour and equipment for Bridge Joint Repairs at KM 292.25 SB Section C5 Propel Berhad 55,131.00 12/09/06 to 12/10/2006 Propel Berhad
19 Project Management for the construction of Pilecap, Pier and Crosshead for project title “Jalan Duta, Jalan Kuching Dan Lain-Lain Di Kuala Lumpur”. Ahmad Zaki Resources Berhad / JKR 11,793,360.10 03/08/04 to 03/11/2006 Acre Works Sdn Bhd
20 Supply labour, materials, plant and machinery and construct and complete New Jersey Barrier at “Jalan Duta, Jalan Kuching Dan Lain-Lain Di Kuala Lumpur”. Ahmad Zaki Resources Berhad / JKR 596,400.00 20/09/04 to 20/11/2006 Ahmad Zaki Sdn Bhd
21 Supply and deliver traffic management, labour and equipment for Bridge Joint Repairs at KM 158.55 Both Bound, Section S2, North South Expressway Propel Berhad 22,647.20 Feb07 Propel Berhad
22 Supply and deliver traffic management, labour and equipment for Bridge Joint Repairs at KM 34.35 Both Boundover strem / Track Bridge Section S4, North South Expressway Propel Berhad 19,625.15 June07 Propel Berhad
23 Supply and deliver traffic management, labour and equipment for Bridge Joint Repairs at KM 304.70 Both Bound, UPM Interchange, Section C5 South Propel Berhad 19,625.15 July07 Propel Berhad
24 Supply and deliver traffic management, labour and equipment for Bridge Joint Repairs at KM 26.10 to KM26.46 East Bound C4, New Klang Valley Expressway Propel Berhad 54,000.00 July07 Propel Berhad
25 Proposed Remedial Works To Damaged Trapezoidal Drain & Embankment Failure From KM 36.90 to KM 37.10 BB, Section C6 Propel Berhad 104,710.40 June-07 Propel Berhad
26 Proposed Bridge Joint Repair at KM159.55 Both Bound Bridge Over Sungai Jawi, Section N3, North South Expressway Propel Berhad 48,860.94 October-07 Propel Berhad
27 Proposed Bridge Joint Repair Bridge Over Sungai Jebung, KM211.70 South Bound, Section N4, North South Expressway Propel Berhad 16,072.71 March-08 Propel Berhad
28 Proposed Surface Protection Works To Cut Slope Erotion At KM18.36 East Bound , Section S1, Seremban Port Dickson Highway Propel Berhad 300,052.50 March-08 Propel Berhad
29 Proposed Bridge Joint Repair Works Ar TG Malim Interchange KM 400.30 Both Bound, Section C3 Propel Berhad 24,520.06 March-08 Propel Berhad
30 Proposed Bridge Joint Repair Works At Bridge Over Sungai Simpang Kiri, KM110.30 Both Bound, Section S3, North South Expressway Propel Berhad 19,302.40 April-08 Propel Berhad
31 Proposed Bridge Joint Repair Works At KM449.10 Both Bound And KM 488.70 South Bound Section C3, North South Expressway Propel Berhad 60,434.70 May-08 Propel Berhad
32 Proposed Repair Works To Localised Embankment Failures at Senawang Interchange KM 256.4 North Bound, Section S1 Propel Berhad RM192,703.80 May-08 Propel Berhad
33 Proposed Bridge Joint Repair Works At Yong Peng North Interchange Bridge,KM99.30 Both Bound Propel Berhad RM 25,020.09 May08 – June08 Propel Berhad
34 Proposed Remedial Works To defective Abutment Slope Protection At Slip Road 3 ( Pulai Interchange, Bridge Over MSSC Express), KM15.412J Both Bound, Section S5, Linkedua Propel Berhad RM 21, 375.00 June-08 Propel Berhad
35 Proposed Bridge Joint Repairs Work At Bridge Over Sg. Pasir, Km 107.75 North Bound, Section N2, North South Expressway Propel Berhad RM 16,515.40 June-08 Propel Berhad
36 Cadangan Pembinaan Persimpangan Bertingkat Di Persimpangan Jalan Cheras / Jalan Keluar Masuk Ke Taman Len Seng, KL – New Jersey Barrier Propel Berhad 248,000.00 June-07 Propel Berhad
37 Proposed Remedial Works To Improper Roadside Drain And Culvert Basin At Culvert Inlet KM305.50 to KM 306.10 SB, Section C5, North South Expressway Propel Berhad 196,279.25 Sep-07 Propel Berhad
38 Proposed Widening Of The Existing Penang Bridge Low Level Viaduct from east abutment to pier 24E and from pier 24W to pier 69W UEM Builders Bhd 2,803,941.00 April 07 – November-08 Acre Works Sdn Bhd
39 Projek Membina Jambatan Baru Dua Lorong Bersebelahan Jambatan Merdeka Dan Membina Jambatan Baru Pinang Tunggal, Seberang Perai Utara, Pulau-Pinang. Pakej ‘C’ – Membina Jambatan Baru Bersebelahan Jambatan Merdeka Prodabena
Sdn Bhd / JKR
92,690.00 05/04/09 – 12/04/09
40 Proposed Bridge Joint Repair Works At Bridge Over Sungai Changlun, KM9.95 Both Bound, Section N1, North South Expressway Propel Berhad RM 20, 834.80 April 09 Propel Berhad
41 Proposed Repair works To Cut Slope Erosion At KM125.55 to KM125.60NB, Section S3 Propel Berhad RM 34, 527.00 April 09 Propel Berhad
42 Project Management for the construction of Pilecap, Pier and Crosshead for project title “ Membina Jalan Penyambung Subang-Kelana”. Ahmad Zaki Resources Berhad / JKR 31,442,395.95 22/04/05 to 22/02/2008 Acre Works Sdn Bhd
43 Menaiktaraf Jalan Dari Seremban Ke Kuala Pilah, Negeri Sembilan (Dari Simpang Senawang – Bukit Putus) Bridge Remaining Structure & Finishes Works (Bridge No.1 (8B), 2 (8D), 4 (8F) & 5 (8G) Realis Sdn Bhd 6,765,939.00 25/08/08 – 24/03/09 Realis Sdn Bhd
44 Menaiktaraf Jalan Dari Seremban Ke Kuala Pilah, Negeri Sembilan (Dari Simpang Senawang – Bukit Putus) Construction Of Vehicular Box Culvert at Ch. 4150 & Construction Of Reinforced Concrete Retaining Wall At Bridge No.2, Abutment ‘B’, CH 6200 – CH 6259 RHS :- Structure & Finishes Works Realis Sdn Bhd 2,358,887.20 24/09/08 – 23/12/08 Realis Sdn Bhd
45 Proposed Bridge Joint Repair Works for Tapah Interchange Bridge & River Bridge outside Mainline at KM326.75 Both Bound Section C1 Propel Berhad 56,062.28 July 09 Propel Berhad
46 Proposed Bridge Joint Repair Works for Bridges at AT KM453.50NB,KM454.70BB,KM454.95BB and KM457.75SB SECTION C3 Propel Berhad 78,762.50 Oct 09 Propel Berhad
47 Proposed Remedial Works At Bridge Over Sungai Malai at KM204.00 Both Bound, Section N4, North South Expressway Propel Berhad 219,156.00 Nov 09 Propel Berhad
48 Proposed Repair Works to Minor Cut Slope Failures at KM231.3 South Bound, Section S1, North South Expressway Propel Berhad 56,062.28 Dec 09 Propel Berhad
49 Proposed Repair Works to Cut Slope Failures At KM19.30 NB Senai Utara Toll Plaza, Section S4, North South Expressway Propel Berhad 93,580.08 June 10 Propel Berhad
50 Trans Eastern Kedah Interland Highway, Dari Durian Burung ke Kupang, Kedah Darul Aman Pakej B; Dri Pedu Ke Sg. Chapar dan Dari Pedu ke Sg. Chapar dan dari Sg. Sok Kw Weng (SEGMEN C: CH.63700 – CH.70900) Bridge Works – Sg. Landai Tandop Besar Construction Sdn Bhd/JKR 2,265,657.80 Main Contractor Mutually terminate the Contract with JKR
51 Cadangan Pembinaan Jalan Baru Dari Kuala Menora / Kg. Guar Cempedak / Kg. Padang Kiri, Teloi Kanan, Baling, Kedah Bridge Works – Sg. Tembak Protab Power Sdn Bhd/JKR 2,057,379.40 05/04/09-04/01/10
52 Proposed Bridge Consisting of A One Way Carriage Way at Selayang Selangor. D. E.
BRIDGE STRUCTURAL WORKS
Bridgex Bina
Sdn Bhd
1,500,635.40 26/10/10 – 31/05/11
53 Projek Menaiktaraf Jalan Perseketuan 3 dari Kuantan (KM9.0) ke Pekan (KM46.0) Pahang Darul Makmur.
CF15- Pedestrian Bridge Works and Kuantan Gambang Interchange
Ahmad Zaki
Sdn Bhd
8,741,478.45 15/11/09 – 30/09/10
54 Proposed Upgrading of the Bridge Deck at the Bridge Over Sg. Jawi KM159.5 Section N3, North South Expressway Soil
Centralab
Sdn Bhd
339,766.00 113 days
55 Proposed Upgrading of the Bridge Deck at the Bridge Over Sg. Junjong KM150.20 BB, Section N3, North South Expressway Soil
Centralab
Sdn Bhd
571,616.00 5 months
56 Proposed Upgrading of the Bridge Deck at the Jawi Interchange Bridge KM163.35 Section N3, North South Expressway Soil
Centralab
Sdn Bhd
183,332.40 5 months
57 Proposed Upgrading of the Bridge Deck at the Bridge Over KTM Track. KM161.50, Section N3, North South Expressway Soil
Centralab
Sdn Bhd
142,516.40 3 months
58 Proposed Remedial Works To Seal Hairline Cracks and Water Proofing for Pier No.4 Both at The Mainline Bridge KM0.90, Section C6,North South Expressway Soil
Centralab
Sdn Bhd
76,743.40 3 months
59 Proposed Remedial Works To Seal Hairline Cracks and Water Proofing for Pier No.5 Both at The Mainline Bridge KM0.90, Section C6,North South Expressway Soil
Centralab
Sdn Bhd
107,943.40 38 days
60 Proposed Remedial Works To Seal Hairline Cracks and Water Proofing for Pier No.1 Both at The Mainline Bridge KM0.90, Section C6,North South Expressway Soil
Centralab
Sdn Bhd
123,362.40 38 days Muz Engineering ServicesSdn Bhd
61 Proposed Remedial Works To Seal Hairline Cracks and Water Proofing for Pier No.3 Both at The Mainline Bridge KM0.90, Section C6,North South Expressway Soil
Centralab
Sdn Bhd
145,397.40 38 days
62 Proposed Remedial Works To Seal Hairline Cracks and Water Proofing for Pier No.2 Both at The Mainline Bridge KM0.90, Section C6,North South Expressway Soil
Centralab
Sdn Bhd
140,922.40 38 days
63 Proposed Remedial Works To Cavity Underneath Transition Slab at The Changkat Interchange Bridge, KM220.00 BB, Section NS,NSE. Soil   Centralab   Sdn Bhd 89,184.34 35 days
64 Proposed Non Destructive Testing, Remedial Works for Cracks on Segmental Deviators in the Box Griders Structure at MSSC Bridge, KM1.779BB, Section S6, Linkedua. Soil               Centralab    Sdn Bhd 21,600.00 83 days
65 Proposed Bridge Joint Repair Works at Railway Bridge KM49.75 Alor Setar Selatan Interchange West Bound, Section N1. Soil Centralab Sdn Bhd 43,080.00 3 days
66 Proposed Remedial Works To Seal Hairline Cracks and Water Proofing for Pier No.6 Both at The Mainline Bridge km0.90, Section C6, North South Expressway Soil Centralab Sdn Bhd 148,516.45 38 days
67 Proposed Bridge Joint Repair Works at KM3.7 Pier P39E, Penang Bound Section N6 Soil Centralab Sdn Bhd 26,142.40  
68 Proposed Bridge Joint Repair Works at Bridge 3, Section 6, Penang Bridge. Soil Centralab Sdn Bhd 74,760.00 45 days
69 Proposed Remedial Works To Seal Hairline Cracks and Water Proofing for Pier No.7 & 8 Both at The Mainline Bridge KM0.90, Section C6, North South Expressway  Soil Centralab Sdn Bhd 269,039.80 83 days
70 Proposed Bridge Joint Repair Works at KM137.8 and KM137.9 NSE Penang Bridge Section N6 Soil Centralab Sdn Bhd 166,360.00  
71 Proposed Remedial Works To Seal Hairline Cracks and Water Proofing for Pier No.9 & 10 Both at The Mainline Bridge KM0.90, Section C6, North South Expressway Soil Centralab Sdn Bhd 189,602.40 68 days
72 Proposed Remedial Works To Seal Hairline Cracks and Water Proofing for Pier No.11 & 12 Both at The Mainline Bridge KM0.90, Section C6, North South Expressway. Soil Centralab Sdn Bhd 189,950.40 68 days
73 Proposed Cavity Development Under Approach Slab at North Abutment South Bound Bridge Over Sg.Bata ( TE1) at KM28.75, Section N1 Soill Centralab Sdn Bhd 31,256.25  
74 Proposed Remedial Works To Seal Hairline Cracks and Water Proofing for Pier No.13 & 14 Both at The Mainline Bridge KM0.90, Section C6, North South Expressway. Soil Centralab Sdn Bhd 249,516.40 68 days
75 Proposed Remedial Works To Cavity Underneath Transition Slab At Nilai Overpass Bridge KM280.60 South Bound, Section C5, North South Expressway. Soil Centralab Sdn Bhd 54,943.60 60 days
76 Proposed Remedial Works To Cavity Underneath Transition Slab At Ipoh Railway Bypass Bridge KM272.80 North Bound, Section N5, North South Expressway Soil Centralab Sdn Bhd 75,561.07 60 days
77 Proposed Remedial Works To Cavity Underneath Transition Slab At Sungai Pari River Bridge KM269.80 South Bound, Section N5, North South Expressway Soil Centralab Sdn Bhd 75,561.07 60 days
78 The Construction and Completion of Facilities Works ( Package A) For Kelana Jaya Line TRC 1,811,621.90 Mar-13 to Dec -13 Gagasan Wajar Sdn Bhd
79 Proposed Remedial Works To Seal Hairline Cracks and Water Proofing For Pier No.15 & 16 Both at The Mainline Bridge KM0.90, Section C6, North South Expressway Soil Centralab Sdn Bhd 249,516.40 68 days
80 Proposed Remedial Works to Cavity Underneath Transition Slab at The Bridge Over Sungai Linggi, KM259.70 North South Expressway. Soil Centralab Sdn Bhd 169,103.95 68 days
81 Proposed Remedial Works To Seal Hairline Cracks and Water Proofing For Pier No. 17 & 18 Both at The Mainline Bridge KM0.90, Section C6, North South Expressway. Soil Centralab Sdn Bhd 249,516.40 68 days
82 Proposed remedial Works To Seal Hairline Cracks and Water Proofing For Pier No.19 & 20, Both at The Mainline Bridge KM0.90, Section C6, North South Expressway.  Soil Centralab Sdn Bhd 185,550.00 68 days
83 Proposed Remedial Works to Cavity Underneath Transition Slab at Sungai Pari River Bridge KM269.80 South Bound, Section N5, North South Expressway. Soil Centralab Snh Bhd 46,683.64  
84 Proposed Remedial Works to Cavity Underneath Transition Slab at Ipoh Railway ByPass Bridge KM272.80 North Bound, Section N5, North South Expressway. Soil Centralab Sdn Bhd 48,587.44